OAR計(jì)算問題解答

此處的budgeted total OH和budgeted total hours是題目給出,,還是自己算的

Absorption process 2021-10-24 09:53:05

問題來源:

Step 4 Overhead absorption

It is a process whereby overhead costs allocated and apportioned to production cost centers are added to unit.

The most common bases of absorption:

? unit

? direct labour hour

? machine hour

? percentage of direct labour costs

? percentage of prime cost

Absorption rate:

 An absorption rate is the rate at which overheads are added to costs

absorption (recovery) rate  =

Predetermined overhead absorption rate =

                   (O.A.R.)     

Step 1 Estimate total overhead for the period.

Step 2 Estimate the activity level for the period.

           (This could be total Hours, Units, or Direct Costs or whatever it is upon which the overhead absorption rates are to be based.)

Step 3 Divide the estimated overhead by the budgeted activity level.

Step 4 absorb the overhead into the cost unit by applying the calculated OAR.

Example: Athena Co makes two products, the Greek and the Roman. Greeks take 2 labour hours each to make and Romans take 5 labour hours. What is the overhead cost per unit for Greeks and Romans respectively if overheads are absorbed on the basis of labour hours?

Estimate the overhead likely to be incurred for the coming period.

     Budgeted total O/H= $50,000

Estimate the activity level for the period. (This could be total units, total hours, or any OAR basis which should be fair)

     Budgeted labour hours = 100,000

OAR =

                                                      = $0.5 per direct labour hour

Absorb overhead into the cost unit by applying the calculated absorption rate:

 

Greek

Roman

labour hour per unit                       

2

5

overhead absorbed per unit         

$1 (2×$0.5)

$2.5 (5×$0.5)

Choosing appropriate absorption rate:

(1) direct labour hour basis

(2) a machine hour rate

(3) a rate per unit (當(dāng)產(chǎn)品indentical時(shí))

(4) percentage of direct labour costs or direct material costs

(5) percentage of prime cost

(6) blanket absorption rate

(7) departmental absorption rate

The choice of an OAR is a matter of judgement and common sense. Many factories use a direct labour hour rate or machine hour rate in preference to a rate based on a percentage of costs.

查看完整問題

瞿老師

2021-10-25 04:23:05 3211人瀏覽

哈嘍,!努力學(xué)習(xí)的小天使:

題目給出的,。

每個(gè)努力學(xué)習(xí)的小天使都會(huì)有收獲的,加油,!
有幫助(5) 答案有問題,?