日韩av免费观看一区二区欧美成人h版在线观看|av日韩精品一区在线观看|18岁女人毛片免费看|国产黄色伦理片在线观看|免费看高潮喷水|邻居人妻电影,|久久中文字幕人妻熟av|极乱家族6|蜜久久久91精品人妻|人妻被x,色色色97大神,日韩高清无码一区二区,国产亚洲欧美一区二区三区在线播放

當(dāng)前位置: 東奧會(huì)計(jì)在線> 財(cái)會(huì)答疑> ACCA > AFM > 答疑詳情

Future Hedge合約價(jià)格變動(dòng)導(dǎo)致虧損

老師您好,,

請(qǐng)問(wèn)為什么在二月末的時(shí)候要買英鎊,,為什么是虧損呢,?

謝謝老師

Steps in a Future Hedge 2021-10-31 23:10:53

問(wèn)題來(lái)源:

Steps in a Future Hedge

Illustration 3:

Today is 31 December. Spandau plc anticipates that in two months' time it will need to pay for purchases of $11 million. The exchange rates on 31 December are:

Spot rate:  1.9615 $ per £.

Futures rates:

 

March

June

$ per £ - contract size £125,000

1.9556

1.9502

Required

Calculate the outcome of using a futures hedge in two months' time if the spot rate is 1.9900 $ per £ and the futures rate is 1.9880 $ per £.

Step 1: Now (31 December)

Type of contract:

The contract currency is £s and Spandau will need to sell £s (to obtain the $s needed), so contracts to sell are needed.

Date of contract:

The earliest futures expiry date after the transaction is March so this will be chosen.

Number of contracts:

The standard contract size is £125,000. At the March futures rate of 1.9556, the number of contracts needed is $11m÷1.9556 = £5,624,872. So the number of contracts needed is £5,624,872/£125,000 = 45 contracts (rounding to the nearest whole contract)

So Spandau will need to enter into 45 March contracts to sell @ 1.9556

Step 2: End February

Complete the actual transaction on the spot market.

So $11m invoice will cost @ Feb spot rate 1.9900 = £5,527,638

This cost is lower because the £ has strengthened. This means that a loss is likely to be made on the futures contract.

Step 3: At the same time as Step 2

Close out the futures contract by buying £s back from the futures market.

31 Dec: contracts to sell £s at

1.9556

end Feb: contracts to buy £s at

1.9880

Difference

0.0324

A loss has been made as the buying price is above the selling price.

The loss can be quantified in one of two ways (either can be used):

1 0.0324 × 125,000 × 45 contracts = $182,250, or

2 $12.50 × 324 ticks × 45 contracts = $182,250

Converting $182,250 into £s at February's spot rate = $182,250/1.9900 = £91,583 loss

So the net outcome from the futures hedge = £5,527,638 cost (Step 2) + £91,583 (Step 3) loss = £5,619,221.

查看完整問(wèn)題

遲老師

2021-11-01 17:56:53 1050人瀏覽

勤奮刻苦的同學(xué),,您好:

因?yàn)樵瓉?lái)合約中規(guī)定的價(jià)格是1.9556, 現(xiàn)在因?yàn)樨泿派盗?,現(xiàn)在要以1.9880價(jià)格購(gòu)買,,要多花錢了,因此形成虧損

每個(gè)努力學(xué)習(xí)的小天使都會(huì)有收獲的,,加油,!
有幫助(2) 答案有問(wèn)題?
熱門知識(shí)點(diǎn)
輔導(dǎo)課程
24年ACCA新課

我們已經(jīng)收到您的反饋

確定